How to install current transformer?

Views : 1543
Update time : 2024-08-09 13:05:16
How to install current transformer?
  • 1. The construction should be carri out according to the drawings, the wiring should be correct, the numbers on both ends of the wires should be clearly mark, and the numbering range should meet the requirements of the regulations.

  • 2. The secondary circuit wires or cables should all use copper wires. The cross-section of the current transformer loop wire should not be less than 2.5mm2, and the cross-section of the voltage transformer loop wire should not be less than 1.5mm2.
  • 3. The first terminal block of the current transformer outlet should use special current terminals. The secondary winding not use by the current transformer should be short-circuit and ground at the terminal board.
  • 4. There should be no joints in the secondary circuit wires in panels and cabinets, and there should be no joints in the middle of control cables or wires. If joints are necessary, they should be transitionally connect through the terminal box of their length.
  • 5. Of course, the polarity of the current transformer cannot be reverse, and the phase sequence and phase difference should comply with the design and regulatory requirements. Due to the wiring of the transformer for differential protection, the current phasor diagram of both arms must be measure before being put into operation to check the wiring. correctness
  • 6. Since the arrangement of secondary circuit wires should be neat and beautiful, the connecting screws between the wires, electrical components and terminal strips must not have loose connections, and the distance between the wire binding handles and the clamping points should meet the requirements of the regulations.

 

Related News
Read More >>
DP Current Transformer for Energy Metering and Industrial Power Monitoring Applications in Jordan DP Current Transformer for Energy Metering and Industrial Power Monitoring Applications in Jordan
Jul .22.2026
DP current transformer delivers accurate energy metering and power monitoring for Jordan projects, supporting electrical panels, industrial applications, and low voltage systems with reliable performance and flexible installation.
Current Transformer for Switchboard Retrofit and Energy Metering Applications in Australia Current Transformer for Switchboard Retrofit and Energy Metering Applications in Australia
Jul .14.2026
KCT-24 current transformer is designed for Australian switchboard retrofit, energy metering and power monitoring applications. With split core installation, multiple output options and compact design, it helps engineers achieve accurate measurement without power interruption in electrical systems.
Current Transformer for Energy Metering and Industrial Power Monitoring Applications in Australia Current Transformer for Energy Metering and Industrial Power Monitoring Applications in Australia
Jul .10.2026
CP-62/40 current transformer delivers accurate measurement for Australian energy metering, electrical panels, and industrial power monitoring with compact design, flexible installation, and reliable performance.
Low Voltage Current Transformer for Energy Metering and Industrial Power Monitoring in India Low Voltage Current Transformer for Energy Metering and Industrial Power Monitoring in India
Jul .06.2026
Low voltage current transformer is used in energy metering, industrial power monitoring, manufacturing plants and automation production systems in India for accurate current measurement, stable monitoring and efficient energy management.